Project: PGE ARENA GDAŃSK
Type: Zabezpieczenia p.poż
Location: Gdańsk (Poland)
Year of completion: 2008-2011 r.
Surface: 10.000 m2
W budowlach, whose main activity is related to mass events are the most important of all kinds of fire protection. Meticulously prepared a draft security has been implemented by means of the PROMAT.
Etapy prac:
- Protection of joints and gaps in fire-fighting system PROMAT PROMASTOP do klasy odporności ogniowej EL120.
- Fire protection of steel structure in the system ROCKWOOL-CONLIT 150.
- Security fire plain and reinforced concrete structural elements in the system PROMAT.
- Fire protection ducts, go installation, Pipe, kabli do klasy odporności EL120 system PROMAT.
19 July 2011 the stadium has been put into operation – budowla odpowiada wszystkim standardom związanym z zabezpieczeniami przeciwpożarowymi.